In a private house      06/16/2019

When the hot water is turned off at Dubninskaya. Hot water shutdown schedule. Shutdown of hot water in the NVAO

Water / Water outages

Shutdowns of hot water in Moscow at addresses. interactive service. 2019

Outages hot water in Moscow in 2019 will begin on May 13. Shutdown periods should not exceed 10 days. When there is no hot water in your house, you can see it using a special online service on the website of the Moscow United Energy Company (MOEK).

The service looks like this:

To find out information about your home, you need to start typing the address you are interested in in the window for entering information, and then select it from the drop-down list of "tips".

If you did not find your address in the widget, please contact your management company for information about the timing of turning off hot water in your house. Most likely, hot water is supplied to your house not by MIPC, but by another company.

Hot water shutdowns in the Northern Administrative District of Moscow (SAO). A bit of history and reasons

Publishing interactive graphs of hot water shutdowns at addresses in Moscow began about five years ago. Prior to this, MOEK, at best, posted Excel files on the Internet, with lists of houses and streets. Well, until the mid-2000s, it was possible to find out about hot water outages only from announcements in the entrance. And in this sense, of course, over the past ten years, the capital's communal services have come a long way.

Why is there a hot water problem? The fact is that the system of supplying heat and hot water in Moscow was formed in the Soviet period and is characterized by extreme centralization. From large thermal power plants, the coolant (they say in a simple way, steam) is supplied directly to the houses. And only in very rare cases do houses have their own boiler rooms (heating boilers have been installed).

As a result, in order to carry out the necessary preventive and repair work, you have to turn off the coolant supply (and hot water is heated from it) for several quarters at once. Otherwise, the central heat pipe cannot be repaired. As a result, residents suffer. They have to sit for weeks without hot water.

Hot water shutdowns - dates and dates for the start of shutdowns in 2019

Hot water shutdowns in Moscow in 2019 begin on April 13. During shutdowns, preventive maintenance is carried out and overhaul at regional thermal stations and central heating points. Repair is carried out using modern energy-saving technologies. Diagnosis of networks, hydraulic tests, and, if necessary, re-laying of pipelines are carried out.

A few years ago, Muscovites lived without hot water for almost a month, then three weeks (21 days), then 2 weeks (14 days), and today the maximum period for turning off hot water is 10 days.

Why are hot water shutdowns in summer in Moscow?

Hot water shutdowns are associated with the so-called "hydraulic tests" tests. They are carried out following the results of a repair campaign on heating systems. For what?

Here is how the public utilities themselves formulate the goals of hydraulic tests:

checking the strength and density of pipelines and their elements, including all welded joints, as well as identifying weak spots caused by corrosion and fatigue of the pipeline metal;

  • checking the quality of repairs performed on heating networks;
  • detection of defects and elimination of the causes of heat and coolant losses;
  • ensuring trouble-free operation of heating network equipment, reliable heat supply to consumers during the heating season.

What does the legislation say about the rights of citizens in connection with the mass shutdowns of hot water in the summer?

The current legislation of the Russian Federation forms the requirements for the organization of hot water supply in apartment buildings in the following way.

Permissible duration of interruption of hot water supply:

  • 8 hours (total) within 1 month;
  • 4 hours at a time;
  • in case of an accident on a dead end highway - 24 hours;
  • during preventive maintenance (once a year);
  • shutdown of hot water systems should not exceed 10 days.

How is the payment for hot water when disconnected?

In the summer, when hot water is turned off for scheduled repairs, a recalculation must be made for consumers - hot water is not charged at this time.

In the event of an unplanned shutdown due to a malfunction engineering equipment- both main and intra-house, recalculation is also made. If the owner of the housing (premises) did not receive hot water in the required volume or there were interruptions in its supply, he can count on the recovery of moral damages and the payment of a penalty provided for by the Law on the Protection of Consumer Rights. It is 3% of the monthly tariff for each day of default management company or supplier organization.

A deviation from the standard values ​​​​by 3 degrees during the day and 5 degrees at night (from 0 o'clock to 5 in the morning) is allowed. If the temperature of "hot" water is below 40 degrees, you can pay for it as for cold water.

Turn off hot water in summer. How to be saved?

According to opinion poll data, 45% of Russians heat water on the stove during hot water outages. Women (52%) and low-income respondents (51%) do this especially often. At the same time, some of them are thinking about buying a water heater, while others consider this invention dangerous.

To turn off the water, those who use the stove have different attitudes. Some are very annoyed: “I’m going crazy from this”; “This shutdown just infuriates me!”; “Three weeks of hot water shutdown is excessive long term for carrying out repair and maintenance work on heating networks”; "Horror . And I try to live somewhere else. Others take this period calmly: "adapt- no problem"; “Not the worst loss. Modern man may well do without hot water for a while.”

Every fifth respondent (20%) has got a water heater. More often, this solution to the problem is preferred by Russians aged 40-49 years (27%) and respondents with high incomes (23%). “Three weeks without hot water is a disaster!” they explain their decision. True, many of those who decide to buy a water heater say that for them, turning off hot water lasts more than three weeks: from a couple of months to decades.

9% of respondents do not experience any inconvenience due to the disconnection of hot water, as they are hardened enough to take cold showers. Men (14%) and those with high incomes (11%) are more likely to brag about this hardening. In their opinion, a cold shower invigorates and is good for the skin.

6% of Russians go to wash with friends and relatives during difficult times. “Very convenient: I ate, washed, talked,” they comment.

Another 3% of respondents believe that turning off hot water is a good reason to go to the bathhouse. “There is nothing more beautiful than on a hot summer day to forget about the hustle and bustle of the metropolis and find yourself in a sauna among beautiful and interesting people and wash at the same time. Moreover, the sauna is good for the skin,” the respondents said.

3% of respondents offered other answers. Here are the most interesting of them: “I go to the pool”; “I don’t wash”, “I wash at work”, “I swear”.

Some Russians are lucky and have no problems with hot water. 9% have a gas water heater.

Well, 5% of respondents do not turn off hot water in summer. Lucky))

It became known the period and terms in which hot water supply will be stopped in connection with planned work. The schedule for turning off hot water is somewhat different for Moscow and for the region. The term of work will be 10 days, but for some areas it has been reduced to three.

Shutdown of hot water supply in Moscow

The hot water shutdown period will begin in May of this year. It will be completed by September. The planned shutdown of hot water will take place in Moscow from May 13, 2019 to September 1. The same period is also relevant for New Moscow. The term for stopping the hot water supply will not exceed ten days. For some areas, it will be limited to 3 days. In some homes, water shutdowns are not expected at all.

The schedule for turning off hot water at the address can be specified in the form at the beginning of the article, on the official website of the Moscow United Energy Company. Or call toll-free hotline which is available to citizens around the clock.

Notification must occur no later than 10 days before the start of work. The information will be constantly updated. Therefore, for individual districts and streets, it must be clarified during the period of preventive work.

In the form or on the MIPC website, hot water shutdown can be clarified for individual administrative districts of the capital and microdistricts.

Disconnection of hot water by district

In order to clarify the start date and the term for stopping the hot water supply for each individual district and microdistrict, it is necessary to select the administrative district from the drop-down list: SVAO, SZAO, VAO, ZAO, Central Administrative District, SEAD, SZAO SAO, SAO. Then determine the street and house number.

In the event that the schedule is not determined, this means that the object of interest is owned by another organization and the work schedule must be clarified directly with the Management Company.

The schedule is presented in full days. That is, the start from 00:00 of the specified date, the planned completion of work at 23:59 of the day indicated in the schedule.

Disconnection of hot water in the South Administrative District

At the beginning of May this year, it will be possible to get acquainted with the interactive list of addresses for the termination of hot water supply and the work schedule.

The list will include 16 districts. Including Biryulyovo, Chertanovo, Tsaritsyno, Orekhovo-Borisovo and others.

Shutdown of hot water in the North-Eastern Administrative Okrug

Termination of hot water supply in the North-Eastern Administrative District of the capital will also be presented in the form of an interactive list. Data on the schedule and timing of the work will be published by MIPC in the first days of May this year.

The list will include 15 districts. Among them will be Sviblovo, Maryina Roshcha, Otradnoye, Bibirevo, Rostokino and others. A detailed schedule for each district can be found separately.

Shutdown of hot water in the Moscow region

Termination of hot water supply in the Moscow region is somewhat different from the capital and may have its own characteristics. This is due to the fact that each of the municipalities sets its own rules and deadlines for the implementation of work.

So if the shutdown of water in Moscow in 2019 will be from 1 to 9 days for each site, then for regional cities the period can stretch up to 14 days. Detailed information the schedule of work at the addresses can be clarified on the official websites of municipal administrations.

Shutdown of water in Zhukovsky

It is already known that the cessation of hot water supply in Zhukovsky will be carried out from May 16 to May 26. Hot water supply time is scheduled for 20:00. During this period, the equipment must be pressure tested, the defects in the heating networks have been identified and eliminated.

Turning off hot water in Khimki

You can get acquainted with the exact schedule of work on the official website of the Administration of the city district of Khimki. The period for the termination of water supply is tentatively scheduled from May 10 to August 20, 2019.

The list of boiler houses where preventive work will be carried out includes those that serve the microdistrict Ivakino, Planernaya, Podrezkino, Novogorsk and others.

Shutdown of hot water in Mytishchi

Work on the restoration of heating networks will be carried out by the Mytishchi Heating Network Company. All detailed information about the period of interruption of the water supply is located at the beginning of the article.

Here you can find the schedule for each street. They are sorted alphabetically with reference to the boiler room.

Shutdown of hot water in the city of Zelenograd

From May to the end of August 2019, work will be carried out in Zelenograd to restore heating networks. As a result, residential buildings will be disconnected from the supply of hot water. The maximum period of work will be 10 days for each section.

You can find out the exact schedule at the addresses for the city of Zelenograd at the beginning of the article.

Shutdown of hot water in Balashikha

Carry out work in preparation for heating season will be " Heating network Balashikha". Detailed information on the timing and addresses of the termination of hot water supply can be found at the beginning of the article.

Shutdown of hot water in the city of Korolev

Science City Korolev will provide information on the timing and areas of preventive work as part of the notification of the population on the official website of the Administration.

More than 20 boiler houses are included in the list of those subject to preventive maintenance. These include Novye podpilki, Tekstilshchiki, Samarovka, Komitetsky forest, Alfa Loval, Suvorovskaya, Tarasovskaya and others.

Shutdown of hot water in the city of Zheleznodorozhny

A detailed schedule and addresses of the shutdown can be found on the website of the city administration or the Government of the Moscow Region. Up-to-date information on this issue will be provided no later than the first days of May of the current year.

The list for work will include more than 25 boiler houses. During the planned period of DHW shutdown, defects in heating networks should be identified and eliminated and they should be prepared for the upcoming heating season.

Disconnection of hot water in the city of Dolgoprudny

Accurate information on the schedule for shutting down the hot water supply will be provided by the City Administration. The term of the work will not exceed 14 days.

Scheduled outage will be indicated in the schedule full days, that is, from 00:00 on the start date to 23:59 on the end date.

Why is hot water turned off?

Turning off the water in the summer is a common occurrence. This is due to the need for preventive work in preparation for the heating season.

Hydraulic tests are carried out in boiler houses and heating networks. They are aimed at:

  • assessment of the quality of repair of heating networks;
  • detection of defects and elimination of the causes of heat loss.

Turning off the water is a necessary measure. Without it, utilities will not be able to conduct necessary work and tests. Therefore, without stopping the hot water supply, it is impossible to adequately prepare for the winter period.

Water / Water outages

On May 10, hot water cuts began in Moscow, according to the Moscow United Energy Company (MOEK, the largest heat supplier in the capital). The shutdowns will last no more than ten days. You can find out when there will be no hot water in your house using one of the special online services.

Schedule for turning off hot water in Moscow. Source - MIPC website

It is MIPC that is responsible for carrying out the repair company on the eve of the new heating season. She is also the primary source of information about the schedule for turning off hot water. Accordingly, MIPC publishes hot water shutdown schedules every year.

About five years ago, these were just Excel files that could be downloaded from the company's website. Today MIPC informs Moscow residents about the upcoming restrictions on hot water supply using an interactive service.

It is on the main page (as far as you can understand, in a somewhat truncated functionality) and in a special section of the company's online services https://online.moek.ru/.

It looks like this:

To find out when there will be no hot water in your house, you must enter the address in the search field. To help users, the service provides a list of "tips" from similar addresses. In addition to the shutdown date, the service also indicates the time (up to an hour) when hot water will be turned off and then turned on at this address.

Hot water shutdown schedule on the Mos.ru website

Since last year, interactive graphs of hot water shutdowns have been published by the Moscow portal mos.ru

The service is located in a special section, which is called just that - Hot water shutdown schedule in Moscow.

This section looks like this:

You can find out when hot water will be turned off in your house right here by typing your address in the box that says "Enter the address of the house"

Hot water shutdown schedule in the Open data section

Website of the Department of Information Technologies of Moscow - Another source where you can get information about turning off hot water in the capital. Or rather, not even the DIT website itself, but a portal where the city authorities publish an array of information as part of the Open Data project.

It has a section "Hot water shutdown schedule". There you can also find the object you are interested in and find out the terms for turning off hot water in it.

The service looks like this:

The service is not as convenient for the average user as MOEK and Mos.ru informers, but it makes it possible to download data on the timing of water shutdowns in different formats, as well as learn about changes in already approved schedules. Sometimes this is important.

Why are hot water shutdowns in summer?

Hot water shutdowns are associated with the so-called "hydraulictests" tests. They are carried out following the results of a repair campaign on heating systems. For what?

Here is how the public utilities themselves formulate the goals of hydraulic tests:

  • checking the strength and density of pipelines and their elements, including all welded joints, as well as identifying weak spots caused by corrosion and fatigue of the pipeline metal;
  • checking the quality of repairs performed on heating networks;
  • detection of defects and elimination of the causes of heat and coolant losses;
  • ensuring trouble-free operation of heating network equipment, reliable heat supply to consumers during the heating season.

What does the legislation say about the rights of citizens in connection with the mass shutdowns of hot water in the summer?

The current legislation of the Russian Federation forms the requirements for the organization of hot water supply in apartment buildings as follows.

Permissible duration of interruption of hot water supply:

  • 8 ocloc'k (total) within 1 month;
  • 4 hours at a time;
  • in case of an accident on a dead end highway - 24 hours;
  • during preventive maintenance (oneonce a year) shutdown of hot water systems should not exceed 10 days.

How is the payment for hot water when disconnected?

In the summer, when hot water is turned off for scheduled repairs, a recalculation must be made for consumers - hot water is not charged at this time.

In case of an unscheduled shutdown, which is associated with a malfunction of engineering equipment - both main and in-house, a recalculation is also made. If the homeowner (premises) did not receive hot water in the required volume or there were interruptions in its supply, he can count on the recovery of moral damages and the payment of a penalty provided for by the Law on the Protection of Consumer Rights. It is 3% of the monthly tariff for each day of non-fulfillment of obligations by the management company or supplier organization.

Allowed deviation from standard values ​​by 3 degrees during the day and 5 degrees at night (With0 hours to 5 am). If the temperature "hot» water below 40 degrees, you can pay for it as cold.

Turn off hot water in summer. How to be saved?

As evidenced by the data of a recent sociological survey, 45% of Russians during hot water outages heat water on the stove. Women especially do this. (52 %) and respondents with low income (51 %). At the same time, some of them are thinking about buying a water heater, while others consider this invention dangerous.

To turn off the water, those who use the stove have different attitudes. Some are very annoying: "I'm goingcrazy about it"; "Methis shutdown is just infuriating!”; "Threeweeks of hot water shutdown is an excessively long time for repair and maintenance work on heating networks”; "Horror. And I try to live somewhere else. Others take this period calmly: "adapt- no problem"; "Notthe worst loss. A modern person can do without hot water for some time.”

Every fifth respondent (20 %) got a water heater. More often, this solution to the problem is preferred by Russians aged 40-49 years. (27 %) and high-income respondents (23 %). "Three weeks without hot water is a disaster!” they explain their decision. True, many of those who decide to buy a water heater say that for them, turning off hot water lasts more than three weeks: from a couple of months to decades.

9% of respondents do not experience any inconvenience due to the disconnection of hot water, as they are hardened enough to take cold showers. Such hardening is more often boasted by men (14 %) and high income holders (11 %). In their opinion, a cold shower invigorates and is good for the skin.

6% of Russians go to wash with friends and relatives during difficult times. "Veryconvenient: ate, washed, talked, ”they comment.

Another 3% of respondents believe that turning off hot water is a good reason to go to the bathhouse. "NoNothing is more beautiful than on a hot summer day, forgetting about the hustle and bustle of the metropolis and finding yourself in a sauna among beautiful and interesting people, and at the same time taking a bath. Moreover, the sauna is good for the skin,” the respondents said.

3% of respondents offered other answers. Here are the most interesting ones: "I'm walking in the pool"; "Not wash", "I wash myself At work", "Swearing».

Some Russians are lucky and have no problems with hot water. 9% have a gas water heater.

Well, 5% of respondents do not turn off hot water in summer. Lucky))

In Moscow, annually from May to the end of August, hot water is turned off for preventive maintenance. The hot water shutdown schedule is drawn up and published before the start of the season planned outages. Enter your address in the line below and find out when hot water will be turned off in 2019.

2. Why is hot water turned off every year in Moscow?

Turning off hot water is a technical necessity for preparing communications for the heating season in order to ensure reliable operation of all elements during the cold season. complex system district heating- thermal stations, main and distribution heating networks, central and individual heating points. Carrying out preventive work, as a rule, requires turning off hot water from consumers for a short period of time.

3. How long is hot water off?

Today in Moscow, the duration of blackouts is no more than 10 days. At the same time, in 2011, water was turned off for 14 days, and even earlier - for 21 days. 10 days is a reasonable term for turning off hot water without losing the quality and reliability of the Moscow heat and power system.

In new microdistricts, where new generation networks have been laid, modern heat points, the shutdown period can be reduced to the minimum required for maintenance work to ensure high-quality equipment preparation. Replacing old motors, pumps and heat exchangers requires more time and attention. For this reason, the shutdown period may vary in different areas, quarters, and even neighboring houses.

The term for turning off hot water for the period of preventive maintenance is indicated from the time and date of the start of the shutdown to the time and date of the end of the shutdown of hot water supply, but cannot exceed 10 days, that is, it must be less than 240 hours.

4. In which houses in Moscow hot water is not turned off at all or is turned off for a short time?

In houses with alternative piping, hot water may not be turned off every year, or for a short period of time, because it is possible to check and repair the main system while hot water is supplied through the backup pipes. However, even the most modern equipment requires prevention, therefore, completely abandon the shutdown of hot water in the metropolis with centralized system heat supply is not possible.

5. Why isn't the cold water turned off?